LDE UTC

15 Mar
Drylining = 2400 LM
Ceilings = 1900 SQM
Acoustics Panels = 960 SQM
Main Contractor = Wates Construction Ltd
Building Use = College for Design and Engineering
Project Duration = 26 Weeks
Project Value = £706k
Description = This was a new build 4 storey College. We predominately undertook the Drylining, 
Ceilings and Acoustics on this project. The building has 3no roof atriums 
which let light through to the lower levels.
The building consists of teaching rooms for engineering, built environment, 
art and design along with a main hall and an outside roof terrace on level 2.

 