Eastbrook Primary, Teaching and Specialist School.


Eastbrook Primary, Teaching and Specialist School.

28 Sep

Drylining = 5725 LM
Ceilings = 12,562 SQM
Main Contractor = Wates Construction Ltd
Building Use = Primary, Teaching & Specialist Schools
Project Duration = 54 Weeks
Project Value = 1.5 Million
Description =  This comprised of 3 separate new build schools. The Primary was the smallest of the buildings as a 2 storey while the Comprehensive and Specialist Blocks were 3 storeys. It was a challenging staged delivery process as the pupils of the existing schools were moved across into the new buildings however we were able to accelerate our works and handover entire buildings rather than areas. These buildings included a Sports Hall, Assembly Hall, Music and Drama Rooms which all required high performance walls, specialist design and experienced installation.
 