Drylining = 4500 LM
Ceilings = 8500 SQM
Main Contractor = Wates Construction Ltd
Building Use = Secondary School
Project Duration = 45 Weeks
Project Value = 1.61 Million
Description = SJP were involved with this project throughout the design phase and were able to work with the Contractor and the Architects to help complete the design in areas where it lacked detail and value engineer the project which ensured that it was well co-ordinated and completed on time and to budget. This was a new build 3 storey project which included a Sports Hall, Assembly Hall, Music and Drama Rooms which all required high performance walls, specialist design and experienced installation. Besides carrying out the drylining and ceilings we undertook the Fire Protection, Acoustic Panelling, External and Internal Architectural Cladding Packages amongst various other works to support the contractor in delivering these works successfully.